SaaS-мониторинг Telegram: ядро (модули Cards/Kanban/Pipeline/Tenants/Settings/ Discovery, Api, Infrastructure), сервисы telegram/ai/ml/storage, фронт Vue, контракты и grpc-hosting, деплой-конфиги (dev/prod/observability/CI-раннер), Gitea Actions CI, документация (ТЗ, техдок, api-map, код-стайл, планы, бэклог). Текущее состояние: все этапы роадмапа 0–12 закрыты, сборка 5 sln 0/0, тесты 1340/130/52/38/9 зелёные.
2.8 KiB
Task 9 Report: CI-скрипты и финальная проверка этапа
Status: DONE — scripts created verbatim, both pass, all four final checks green. No deviations.
Files
| File | Action |
|---|---|
scripts/build.sh |
Created (verbatim, plan lines 774–778) |
scripts/test.sh |
Created (verbatim, plan lines 782–787) |
.superpowers/sdd/deal-scaffold/progress.md |
Appended Task 9 ledger line after Task 8 (nothing else touched) |
Script contents (both use sh, set -e, resolve repo root via $(dirname "$0")/..):
scripts/build.sh→cd src/core && dotnet build Deal.slnscripts/test.sh→cd src/core && dotnet test tests/Deal.Tests.Unit
No project/source files modified. No git operations (project is not a git repo).
Script run output (Step 3, from C:\telbase)
sh scripts/build.sh — succeeded: 11/11 projects built, «Сборка успешно выполнено через 1,9 с», 0 warnings/0 errors.
sh scripts/test.sh — succeeded: «Сводка теста: всего: 6; сбой: 0; успешно: 6; пропущено: 0; длительность: 1,0 с» (build 2,9 с).
Final stage verification (Step 4)
| # | Check | Result |
|---|---|---|
| 1 | dotnet build Deal.sln (src/core) |
PASS — 11/11 projects, 0 errors, 0 warnings |
| 2 | dotnet test tests/Deal.Tests.Unit (src/core) |
PASS — 6 PASS / 0 FAIL / 0 skipped |
| 3 | docker ps → deal-postgres |
PASS — «Up 12 minutes (healthy)» |
| 4 | curl http://localhost:5080/api/health |
PASS — {"ok":true,"service":"deal"}; process killed, port released |
Check 4 detail (background pattern from earlier tasks):
dotnet run --project Deal.Api --no-build --urls http://localhost:5080 & → sleep 8 →
curl -s http://localhost:5080/api/health returned {"ok":true,"service":"deal"} →
kill $APP_PID (PID 1384) → follow-up after 2 s: curl -m 3 exit 7 (connection refused),
netstat -ano shows no LISTENING socket on :5080 (only a client-side TIME_WAIT entry, PID 0).
App log tail confirms clean startup («Application started. Press Ctrl+C to shut down.»), no errors.
Concerns
- None blocking. Minor notes:
curlexit code (7) and netstat were used to confirm port release; a residual client-sideTIME_WAITsocket on the ephemeral port is expected and self-clears — no listening socket remains.- Scripts verified under the environment's
sh(Windows); they make no assumptions beyond POSIXshanddotneton PATH, so they are CI-portable. No chmod needed on this platform. dotnet runlog redirected to/tmp/deal-api-task9.logduring the health check for diagnosability.
Verification
- Ledger updated:
.superpowers/sdd/deal-scaffold/progress.md→ Task 9 line appended under «## Task status». - This report supersedes as the record for Task 9; no project files changed by this task.